SBC “Directory of basic prices for design work for construction. Energy facilities. State estimate standard "Directory of basic prices for design work in construction" Housing and civil construction projects" Directory of prices for design work

Reference price guides

(sprav_baz_cen)

1. General guidelines for the use of reference price reference books for design work for construction (spravbazcen 1.rar)

2. Temporary reference book of basic prices for design work for construction. Objects of the agro-industrial complex, trade and public catering (spravbazcen2 .rar)

3. A guide to determining the relative cost of developing project documentation. Objects of the agro-industrial complex, trade and public catering (spravbazcen3 .rar)

4. A practical guide to using the reference price guide for design work for construction. Objects of the agro-industrial complex, trade and public catering (main provisions) (spravbazcen 4.rar)

5. Recommendations for determining the coefficient to base prices for design work, taking into account the additional costs of organizations for preferential wage payments (spravbazcen 5.rar)

6. Directory of basic prices for engineering and geodetic surveys during the construction and operation of buildings and structures (spravbazcen 6.rar)

7. Directory of basic prices for engineering-geological and engineering-ecological surveys for construction (instead of Chapters 12, 14 and 15 and table 298 of Chapter 17 of the Collection of prices for survey work for capital construction 1982; Directory of basic prices for laboratory engineering-geological work 1996; Directory of basic prices for desk engineering-geological work; Directory of basic prices for drilling work during engineering-geological surveys for construction) (spravbazcen 7.rar)

8. Directory of basic prices for engineering surveys for construction. Engineering and geodetic surveys. 2004 (instead of the Collection of prices for survey work for capital construction. 1982, part I (tables 8-37, 50, 55-60, 62-73, 77-80, 84-92); part III, chapter 8 (tables 113, 115-119, 122-127, 152, 153), chapters 9-11; part VII (table 403); part VIII (tables 408-410, 414, 415, 418-420); Appendix 3 (tables 7-9, 13, 22, 23); Directory of enlarged base prices for engineering and geodetic surveys for construction. 1997) (spravbazcen8.rar)

9. Directory of basic prices for engineering surveys for construction. Engineering and hydrographic works. Engineering and hydrometeorological surveys on rivers (Enacted into force on January 1, 2001, replacing: Chapters 3 (Tables 62, 63); 5 (Tables 86, 87, 90-92); 6; 7; 8 (Tables 128-133 and 148-151); 19 (except for tables 317, 318, and 320, 321); 21 (tables 358-360); appendices 3 (tables 14-16) Collection of prices for survey work for capital construction, M. , 1982) (spravbazcen9.rar)

10. Directory of basic prices for measurement work and inspections of buildings and structures (spravbazcen 10.rar)

11. Directory of basic prices for design work for construction. Gas equipment and gas supply to industrial enterprises, buildings and structures. Outdoor lighting (spravbazcen 11.rar)

12. Practical guide to using the reference price guide for design work for construction. Gas equipment and gas supply to industrial enterprises, buildings and structures. Outdoor lighting (spravbazcen 12.rar)

13. Directory of basic prices for design work for construction. Urban planning documentation (spravbazcen 13 .rar)

14. A guide to determining the construction cost of developing urban planning documentation (spravbazcen 14.rar)

15. Directory of basic prices for design work for construction. Railways and roads. Bridges. Tunnels. Subways. Industrial transport (spravbazcen 15 .rar)

16. Directory of basic prices for design work for construction. Buried structures and structures, water dewatering, anti-landslide structures and measures, pile foundations (instead of section 63 “Buried structures and structures, construction dewatering and drainage” of the Collection of prices for design work for construction. 1987) (spravbazcen 16.rar)

17. A guide to determining the relative cost of developing design estimates. To the “Directory of basic prices for design work for construction. Railways and roads. Bridges. Tunnels. Subways. Industrial transport" (spravbazcen 17 .rar)

18. Directory of basic prices for design work for construction. Engineering and technical measures of civil defense. Measures to prevent emergency situations. Protective structures for civil defense and other special structures. (spravbazcen 18.rar)

19. Directory of basic prices for design work for construction. Artificial constructions. 2004 (instead of Chapter 4 "Artificial structures" of the Directory of basic prices for design work for construction "Railways and highways. Bridges. Tunnels. Subways. Industrial transport". 1999) (spravbazcen 19 .rar)

20. Directory of basic prices for design work for construction. Subways. 2004 (instead of Chapter 2 "Metropolitans" of the Directory of basic prices for design work for construction "Railways and highways. Bridges. Tunnels. Subways. Industrial transport". 1995) (spravbazcen20.rar)

21. Directory of basic prices for design work for construction. Objects of the aluminum and electrode industry (instead of Chapter 3 of Section 7 "Non-Ferrous Metallurgy" of the Collection of prices for design work for construction. 1987) (spravbazcen2 1.rar)

22. Directory of basic prices for design work for construction. Nuclear energy facilities (2nd edition) (spravbazcen 22.rar)

23. Practical guide on the use of a reference book of basic prices for design work for the construction of nuclear energy facilities (main provisions, relative cost of developing design documentation) (spravbazcen 23.rar)

24. Directory of basic prices for design work for construction. Water supply and sewerage facilities. 2004 (replacing Directory 1995) (spravbazcen24.rar)

25. Directory of basic prices for design work for construction. Gas industry facilities (2nd edition) (spravbazcen 25.rar)

26. A guide to determining the relative cost of developing project documentation. Gas industry facilities (2nd edition) (spravbazcen26.rar)

27. A practical guide to using the reference price guide for design work for construction. Gas industry facilities (2nd edition) (spravbazcen27.rar)

28. Directory of basic prices for design work for construction. Mining industry facilities. 2004 (instead of section 8 "Mining industry" of the Collection of prices for design work for construction. 1987) (spravbazcen28.rar)

29. Directory of basic prices for design work for construction. Civil aviation facilities. 2004 (instead of section 36 "Buildings and structures of air transport" of the Collection of prices for design work for construction. 1987 and the Directory of basic prices for design work for construction "Civil Aviation Facilities". 1995) (spravbazcen29.rar)

30. Directory of basic prices for design work for construction. Objects of housing and civil construction. 2003 (instead of the Directory... 1994 and sections of the Collection of prices for design work for construction No. 39 “Residential and civil buildings” and No. 56 “Utilities”) (spravbazcen 30.rar)

31. Practical guide to using the reference price guide for design work for construction. Forestry objects (spravbazcen3 1.rar)

32. Directory of basic prices for design work for construction. Forestry objects (spravbazcen 32.rar)

33. A practical guide to using the reference price guide for design work for construction. Objects of main oil transportation (spravbazcen33.rar)

34. Directory of basic prices for design work for construction. Objects of main oil transportation (spravbazcen 34.rar)

35. Practical guide to using the reference price guide for design work for construction. Objects of mechanical engineering industry (spravbazcen35 .rar)

36. Directory of basic prices for design work for construction. Objects of the mechanical engineering industry (spravbazcen 36.rar)

37. Directory of basic prices for design work for construction. Objects of reclamation and water management construction (instead of section 34 "Water management construction" of the Collection of prices for design work for construction. 1987) (spravbazcen37.rar)

38. Directory of basic prices for design work for construction. Marine transport facilities (instead of section 35 "Maritime transport enterprises" of the Collection of prices for design work for construction. 1987) (spravbazcen38.rar)

39. Directory of basic prices for design work for construction. Objects of the flour-grinding and feed industry. 2004 (instead of section 32 “Flour, cereal and feed industry” of the Collection of prices for design work for construction. 1987) (spravbazcen39.rar)

40. Directory of basic prices for design work for construction. Oil industry facilities (spravbazcen 40.rar)

41. Practical guide to using the reference price guide for design work for construction. Oil industry facilities (spravbazcen4 1.rar)

42. Directory of basic prices for design work for construction. Facilities of the oil refining and petrochemical industry (instead of the Directory of basic prices for design work for construction "Oil Refining Industry Facilities" 1997 and chapters 2, 3, 4 of section 3 "Oil refining and petrochemical industry" of the Collection of prices for design work for construction. 1987) (spravbazcen42. rar)

43. Directory of basic prices for design work for construction. Objects of the printing industry (spravbazcen 43.rar)

44. Practical guide on the use of a reference book of basic prices for design work for the construction of printing industry facilities (basic provisions, relative cost of developing design estimates) (spravbazcen 44.rar)

45. Directory of basic prices for design work for construction. Building materials industry facilities (spravbazcen 45.rar)

46. ​​Practical guide to using the reference price guide for design work for construction. Objects of the building materials industry (spravbazcen46 .rar)

47. Directory of basic prices for design work for construction. Chemical fiber industry facilities (instead of Chapter 5 "Sub-industry of chemical fibers and threads" and Chapter 14 "Ancillary and service facilities, on-site networks and water supply, sewerage, heat supply and electricity structures" of Section 9 "Chemical industry" of the Collection of prices for design work for construction . 1987) (spravbazcen47.rar)

48. Directory of basic prices for design work for construction. River transport objects. 2004 (replacing Directory 1995) (spravbazcen48.rar)

49. Directory of basic prices for design work for construction. Communication objects (spravbazcen49.rar)

50. A guide to determining the relative cost of developing design documentation for communication facilities (spravbazcen 50.rar)

51. Practical guidance on the use of the Directory of basic prices for design work for construction "Communication facilities" (General provisions) (spravbazcen 51.rar)

52. Practical guidance on the application of the Directory of basic prices for design work for the construction of "Communication Facilities" (Explanations on the procedure for applying basic prices for design work for the construction of electrical and postal communication facilities - tables 1-10, 22 of the Directory of Basic Prices) (spravbazcen 52. rar)

53. Directory of basic prices for design work for construction. Objects of the shipbuilding industry (instead of the Industry section "Shipbuilding Industry" of the Collection of prices for design work for construction, 2nd edition, 1991) (spravbazcen 53.rar)

54. Directory of basic prices for design work for construction. Pulp and paper industry facilities (spravbazcen 54.rar)

55. Practical guide to using the reference price guide for design work for the construction of pulp and paper industry facilities (spravbazcen 55.rar)

56. Directory of basic prices for design work for construction. Energy facilities. 2003 (instead of the Collection of prices for design work for construction. Section 1. Electric power industry, Directory of basic prices for design work for construction. Energy facilities, Guidelines for determining the relative cost of developing design documentation, the unit cost of developing working documentation for buildings, structures and types of work. Objects energy, Practical guide to using the reference price guide for design work for construction. Energy facilities) (spravbazcen56.rar)

57. Directory of basic prices for design work for construction. Road transport enterprises. Operation, technical service and storage of automotive equipment. (spravbazcen57.rar)

58. Directory of basic prices for design work for construction. Transport enterprises, storage of petroleum products and gas stations (spravbazcen 58.rar)

59. A practical guide to using the reference price guide for design work for construction. Transport enterprises, storage of petroleum products and gas stations (spravbazcen59 .rar)

60. Directory of basic prices for design work for construction. Industrial furnaces, dryers, chimneys and ventilation pipes, thermal insulation and anti-corrosion protection structures (instead of section 62 "Industrial furnaces, dryers, chimney and ventilation pipes, thermal insulation and anti-corrosion protection structures" of the Collection of prices for design work for construction. 1987) (spravbazcen60 .rar)

61. Directory of basic prices for the development of technical documentation for automated process control systems (APCS) (spravbazcen 61.rar)

62. Practical guide to using the reference price guide for the development of design documentation for custom-made equipment (spravbazcen 62.rar)

63. Directory of basic prices for the development of design documentation for custom-made equipment (spravbazcen 63.rar)

64. Directory of basic prices for the development of technical documentation for major repairs of building structures of buildings and structures (spravbazcen 64.rar)

65. Explanations on the use of the collection of prices and reference books of basic prices for design work for construction (spravbazcen 65.rar)

66. Practical guide to using the reference price guide for design work for construction. Fire and security protection systems (spravbazcen66.rar)

67. Directory of basic prices for design work for construction. Fire and security protection systems (spravbazcen 67.rar)

68. Directory of basic prices for design work on inspection, assessment of technical condition, testing and strengthening of building structures of buildings, structures, cranes and elevators. Edition 2 (spravbazcen68.rar)

Where

WITH

"A" And " V" - constant values ​​for a certain interval of the natural indicator;

X - natural indicator.

TO i

C = C 01 ´ TO i

Where

WITH - base price of urban planning documentation in current prices;

C 01 - base price of urban planning documentation in prices as of 01/01/2001;

TO i - coefficient reflecting inflation processes at the time of determining the base price for the development of urban planning documentation;

2. The base price of the territory surveying project is determined according to the price indicators given in this Handbook, with a reduction factor of up to 0.4.

Table No. 1. Territorial planning

N p/p

A

V

Territorial planning of a subject of the Russian Federation and its municipalities with area, thousand square meters. km

up to 5

thousand sq. km

1321,38

21,73

over 5 to 10

1323,88

21,23

over 10 to 25

1408,88

12,73

over 25 to 50

1474,13

10,12

over 50 to 100

1485,13

9,90

over 100 to 200

1892,13

5,83

over 200 to 300

2178,13

4,40

over 300 to 400

2442,13

3,52

over 400 to 500

2662,13

2,97

over 500 to 600

2947,13

2,40

over 600 to 700

3649,13

1,23

Table No. 2. General plans of settlements and urban districts

N p/p

Name of urban planning documentation

Unit of measurement of the main indicator of the object

Constant values ​​of the base price for the development of urban planning documentation thousand rubles.

A

V

General plans of settlements and urban districts based on population, thousand people.

up to 5

thousand people

47,06

11,22

over 5 to 10

54,36

9,76

over 10 to 25

78,16

7,38

over 25 to 50

92,16

6,82

over 50 to 100

178,66

5,09

over 100 to 200

331,66

3,56

over 200 to 300

545,66

2,49

over 300 to 400

857,66

1,45

over 400 to 500

1229,66

0,52

over 500 to 600

1254,66

0,47

over 600 to 700

1422,66

0,19

over 700 to 800

1457,66

0,14

Table No. 3. Territory planning projects

N p/p

Name of urban planning documentation

Unit of measurement of the main indicator of the object

Constant values ​​of the base price for the development of urban planning documentation thousand rubles.

A

V

Territory planning project for the area of ​​the designed territory, hectares

over 0.5 to 5

1 ha

55,88

189,64

over 5 to 10

276,53

145,51

over 10 to 15

504,13

122,75

over 15 to 20

856,63

99,25

over 20 to 25

1092,23

87,47

over 25 to 50

1496,98

71,28

Table No. 4. Long-term plan for landscaping the city

N p/p

Name of the design object

Base price thousand rubles with a design population of thousand people.

1000

Perspective plan for city landscaping

Including:

170,94

220,22

279,84

Architectural and planning solutions

42,68

59,40

75,46

Dendrological composition of plantings

42,68

55,00

69,96

Agricultural technology for landscaping work

18,70

24,20

30,80

Volume, priority and cost of green construction work

29,26

37,40

47,74

Scope and cost of work on the operation of green spaces

18,70

Unit of measurement of the main indicator of the object

Constant values ​​of the base price for the development of design and working documentation, thousand rubles.

A

V

Parks, gardens, squares, boulevards, area, hectares

up to 1

ha

18,92

5,06

over 1 to 5

21,43

2,55

over 5 to 10

21,78

2,48

over 10 to 25

32,68

1,39

over 25 to 50

36,93

1,22

over 50 to 100

40,43

1,15

over 100 to 200

63,43

0,92

Sanitary protection zones area, hectares

up to 50

ha

7,15

0,34

over 50 to 100

16,65

0,15

over 100 to 200

22,65

0,09

over 200 to 500

26,65

0,07

over 500 to 1000

41,65

STATE COMMITTEE OF THE RUSSIAN FEDERATION ON
CONSTRUCTION AND HOUSING AND COMMUNAL COMPLEX

GOSSTROY OF RUSSIA

GENERAL INSTRUCTIONS
ON THE APPLICATION OF BASIC PRICE DIRECTORIES
FOR DESIGN WORK FOR CONSTRUCTION

Approved
Resolution of the Gosstroy of Russia dated 07.08.02 No. 102

MOSCOW 2002

General guidelines for the use of Directories of basic prices for design work for construction have been developed by the Federal State Unitary Enterprise "CENTRINVESTproject" of the State Construction Committee of Russia.

Introduced and prepared for approval by the Department of Pricing and Estimated Standardization in Construction and the Housing and Communal Sector of the Gosstroy of Russia.

Put into effect on August 10, 2002 by Decree of the State Construction Committee of Russia dated 08/07/02 No. 102.

INTRODUCTION

Directories of basic prices for design work for construction (hereinafter referred to as Directories) are intended to determine basic prices for the purpose of subsequent formation of contract prices for the development of design documentation for new construction, expansion, reconstruction and technical re-equipment of industrial and housing and civil facilities.

General instructions are mandatory for use when using prices for design work given in all Directories.

I. GENERAL GUIDELINES FOR THE APPLICATION OF BASIC PRICE GUIDELINES FOR DESIGN WORK FOR CONSTRUCTION

1. Directories are intended for use by organizations of various organizational and legal forms that, according to the legislation of the Russian Federation, have the status of a legal entity.

2. Basic prices in the Directories are set depending on the natural indicators of the design objects (power, length, capacity, area, etc.) and the total cost of construction.

3. The prices given in the Directories are set in accordance with the composition, procedure for the development, coordination and approval of project documentation for the construction of enterprises, buildings, structures provided for by SNiP 11-01-95.

4. The Directories contain prices for individual design of new construction of objects, buildings and structures, as well as individual elements of the complex using materials from standard and reused economical individual designs of workshops, buildings and structures included in them, as well as drawings of standard building structures, products and components.

Prices take into account all costs for the development of project documentation and profit, excluding value added tax.

6. The prices of the Directories take into account and do not require additional payment for the following works and services:

6.1 production of demonstration materials (except for demonstration models);

6.2 participation of the design organization together with the customer in the coordination of finished project documentation with state bodies and local governments;

6.3 protection of the working draft (project) in the examining and approving authorities.

7. The comprehensive prices of the Directories for the development of project documentation do not take into account the costs of:

7.1 development of design solutions specified in the design assignment in several options, with the exception of variant studies for selecting optimal design solutions.

The development of additional options for the project, detailed design or individual technological, structural, architectural and other solutions is established in the design assignment, where sections (or parts of these sections) of the project for which the development of these options and the initial data necessary for them must also be determined. development.

The degree of development of additional options is established in agreement with the customer.

During the development process, both the main and additional options, variant development of design solutions is carried out;

7.2 development of working drawings for special auxiliary structures, fixtures, devices and installations when designing objects with particularly complex structures and methods of work.

The base price for the development of working drawings of the specified structures, fixtures and devices is determined in the manner established by construction organizations, or by calculating the cost in accordance with the cost calculation;

7.3 development of solutions for monumental and decorative design of enterprises, buildings and structures.

Such work, in cases where it is provided for in the design assignment, is carried out, as a rule, by art fund organizations under separate contracts and prices;

7.4 making changes to the design documentation (with the exception of correcting errors made by the design organization).

The execution of the specified work must be provided for in the design task for the facility or a separate order from the customer and must be paid additionally;

7.5 development of detail drawings of metal structures (DMD) and prefabricated process pipelines.

The costs of the design organization carrying out the development of KMD drawings on behalf of the customer are determined according to the departmental prices of the manufacturing plants or based on cost calculations and are paid additionally;

7.6 inspections and measurement work at facilities subject to reconstruction, expansion and technical re-equipment.

The cost of such work should be determined using the relevant Directories, or by calculating the cost in accordance with cost calculation;

7.7 development of design documentation for individually manufactured equipment, in addition to drawing up the initial requirements for the design of this equipment.

The reference price guide takes into account the costs of drawing up initial requirements for the development of design documentation for individually manufactured equipment, including single and small-scale equipment. The technical specifications for the specified equipment are developed by the manufacturer.

In some cases, when the development of the specified design documentation is entrusted to a design organization, it is carried out, as a rule, under agreements with the equipment manufacturer. If the manufacturer is not determined, then the development of design documentation for the equipment can be carried out by a design organization on behalf of the customer. In this case, the base price for performing the specified design work is determined according to the departmental prices of the manufacturers of the specified equipment;

7.8 business trips.

The base prices of the Directory do not take into account the costs of business trips, including the costs of administrative personnel, if the trips of this personnel are directly related to the design of the facility;

7.9 development of projects for construction and installation works (CEP);

7.10 development of design documentation for the construction of temporary buildings and structures for the needs of construction organizations;

7.12 research and experimental work;

7.13 development of automated enterprise management systems (APCS) and automated process control systems (APCS).

The base price for the design of automated control systems and automated process control systems is determined according to the relevant price documents for the development of the specified technical documentation;

7.14 development of the ITM GOES section; the base development price is determined according to the relevant Directory;

7.15 development of the EIA section;

7.16 development of interiors carried out in accordance with GOST 21.507-81.

II. PROCEDURE FOR DETERMINING BASIC PRICES FOR DESIGN WORK

A. Depending on the natural indicators of design objects

1. The base price for the development of project documentation (project + working documentation) is determined by the formula:

C =(a + in x) × K i,

Where

"A"And "V" - constant values ​​for a certain interval of the main indicator of the designed object, in thousand rubles;

X -the main indicator of the designed object;

K i -

2. The prices of the Directories for the development of design documentation for enterprises, workshops, buildings and structures take into account the cost of designing all on-site engineering networks, communications, structures and devices (electricity, water supply, sewerage, heat supply, etc.), including the connection of workshops, buildings and structures to them , as well as a general plan and landscaping within the construction site. If the price in the Directory is set for the development of design documentation for the main production (without taking into account auxiliary, as well as on-site engineering networks and structures), a comprehensive assessment is carried out by a set of cost indicators for the design of main and auxiliary facilities.

The cost of designing off-site engineering networks and communications in complex prices is not taken into account and is determined additionally.

3. The price for developing design documentation for individual workshops, buildings and structures, carried out by subcontracting design organizations, in cases where the cost of designing these objects is taken into account by the prices of the relevant Directory, is determined at the same prices at which the cost of design was determined by the general designer.

4. If the projected object has a value of the main indicator less than the minimum or more than the maximum indicators given in the price tables of the Directories, the price for developing design documentation is determined by extrapolation in accordance with the formula given in the appendix.

In cases where the accepted indicator is less than half the minimum or more than double the maximum indicator given in the table, the base price of design work is determined in the manner established by clause.

7. The price for developing technical documentation for major repairs of building structures of buildings and structures is determined according to the relevant Directory of Basic Prices.

If it is impossible to apply the specified Directory, the price of work can be determined using the corresponding Directories of basic prices for design work for new construction conditions using a reduction factor to the design price for new construction conditions in the amount of no more0.5 depending on the amount of work.

8. Costs of design organizations located in areas in which, in accordance with current legislation, payments are made due to regional regulation of wages, incl. payments according to regional coefficients, as well as wage supplements for continuous work experience and other benefits provided for by law in the regions of the Far North and equivalent areas, are determined additionally by introducing increasing coefficients to the total base price, established on the basis of relevant substantiating calculations performed the design organization itself.

The method for calculating increasing coefficients is set out in the “Recommendations for determining the coefficient to base prices for design work, taking into account the additional costs of organizations for preferential wage payments,” approved and recommended for use by letter of the Gosstroy of Russia dated June 30, 1998 No. 9-10-17 /40.

B. From the total cost of construction

9. The base price of design documentation (project + working documentation) is determined from the total cost of construction depending on the categories of complexity of design objects.

10. The price of design documentation includes the cost of designing the entire complex of buildings, structures and types of design work, reflected in the total cost of construction, determined by an analogue object, taking into account their comparability or by aggregated indicators of estimated standards (per unit of indicators: 1 sq. m total area, 1 cu. m volume of the building, 1 p.m. tracks, 1 ha development, per unit of power, productivity, etc.).

11. The price of design documentation is determined using tables corresponding to the purpose of the design objects.

12. The base price of project documentation is determined by the formula:

C = C 01 × Ki,

Where

WITH -base price of project documentation in current prices;

C 01 - base price of design documentation for 01/01/2001;

TOi - coefficient reflecting inflation processes at the time of determining the price of design work for the construction of a facility.

To recalculate the cost of construction of facilities from the price level as of 01/01/2000 to the price level as of 01/01/2001, a coefficient equal to 1,38.

13. In cases where the projected object has a construction cost value that is between the indicators given in the table, the base price for the development of design documentation is determined by interpolation.

If the cost of constructing an object is less or more than the extreme cost indicators given in the price table, the base price of the design work is accepted in the amounts established for the extreme indicators (without extrapolation downwards or upwards).

* * *

15. The distribution of the price of design work by design stages is given in the Directories and can be clarified by agreement between the design organization and the customer.

16. The cost of individual sections of design documentation, taken into account at base prices, for new construction projects is determined according to the tables of relative (approximate) costs given in the Reference Books and can be specified by the management of the design organization within the limits of the total cost for each stage of design, both when performing work on its own, as well as and when transferring part of the work to subcontracting design organizations in agreement with them.

In the same manner, the relative cost of other sections of design work taken into account by the base prices, but not highlighted in the relative cost tables, can be determined.

The relative cost of developing sections of design work during the reconstruction and technical re-equipment of existing enterprises, buildings and structures is established by the design organization within the limits of a certain total design cost, depending on the labor intensity of the work performed.

III. PROCEDURE FOR DETERMINING THE COST OF DESIGN WORK, TAKEN INTO ACCOUNT OF ADDITIONAL FACTORS AFFECTING THE LABOR INTENSITY OF DESIGN

1. The price for developing design documentation using the mock-up design method is determined according to the prices of the Directories using increasing factors.

If there are no established increasing coefficients in the Directories, the price of developing project documentation using the specified method is determined by applying the coefficients to the base price: at the “project” stage - 1.05; at the “detailed draft” and “working documentation” stage - 1.1.

2. The price of design work to be carried out in a reduced composition and volume compared to that provided for by current regulatory documents (development of additional design options or individual technological, structural, architectural and other solutions developed in accordance with the design assignment) is determined at the prices for the development of design documentation the corresponding object using a reduction factor, the size of which is set by the contractor in accordance with the labor intensity of the work in agreement with the customer.

3. When constructing in queues, the price for developing detailed designs (projects) of enterprises and structures is determined according to the prices of the Directories, based on the main indicators of each queue separately. In this case, up to 20 percent of the cost of developing a detailed design (without working documentation) or a design for all subsequent stages is added to the cost of designing the first stage of construction.

4. The price of linking standard projects is determined by the prices of the Directories using a coefficient of 0.35.

The price of linking standard projects with changes to them is determined according to the prices of the Directories using a coefficient of up to 0.7, depending on the labor intensity of the work.

5. The price of developing design documentation for the construction of objects classified as unique and experimental in accordance with clause 8.4 of SNiP 10-01-94 “System of regulatory documents in construction. Basic provisions”, determined by the prices of the Directories; in this case, a coefficient of 1.5 is applied to the cost of those types of design work, the development of which is more complicated.

6. The price of developing design documentation for the construction of enterprises, buildings and structures in difficult conditions is determined at the prices of the Directories with the following coefficients applied to the cost of design work, for the development of which the relevant regulatory documents establish special requirements:

If there are two or more complicating factors, coefficients are applied for each factor.

7. The price of designing enterprises, buildings and structures with the installation of imported main technological equipment used by the design organization for the first time is determined according to the prices of the Directories; in this case, to the cost of types of design work, the development of which is complicated due to the use of the specified equipment, in agreement with the customer, a coefficient of up to 1.3 is applied.

8. The costs of design organizations associated with their implementation of the functions of general designer and supervision of design work transferred to subcontract are determined in the amount of up to 2% of the price of development of design documentation transferred to subcontracted design organizations, and are paid additionally.

9. The prices of the Directories take into account the cost 4 copies of design documentation issued to the customer.

The cost of copies of design products issued at the request of the customer in excess of the specified quantity is determined in addition to the base price.

10. When determining the cost of design work at the prices of the Directories in the presence of several complicating factors and in connection with this the application of several coefficients greater than one, the overall increasing coefficient is determined by summing their fractional parts and one.

When determining the cost of design work using several coefficients less than one, the overall reduction coefficient is determined by multiplying them.

11. Instructions for the use of prices and correction factors given in one Directory are not allowed to be used when determining the cost of design work in other Directories.

12. When determining the base price of design according to the Directories of base prices for design work for construction, in the event of a reduction in specific design periods compared to the standard ones, in agreement with the customer, it is recommended to apply the following increasing factors:

when the period is reduced by 1.2 times - up to 1.1;

1.4 times - up to 1.2;

2 or more times - up to 1.4.

13. The price for the development of design documentation, carried out in accordance with the relevant regulatory documents regulating the design of objects for construction abroad, is determined in the following order.

The price of performing justifications for investments in construction is determined by prices for project development using a coefficient of up to 0.5.

In cases where, during the development of justifications, a site (route) is selected for the construction of an enterprise, building, structure, the specified coefficient increases by 0.05.

The price for the implementation of projects, detailed designs and working documentation for new construction of enterprises, buildings and structures is determined according to the prices of the Directories using coefficients of 1.2, respectively; 1.04 and 1.

The price for developing design documentation for the reconstruction and technical re-equipment of existing enterprises, buildings and structures is determined in the manner set out in paragraphs. and section.

Additionally, coefficients are applied that take into account the influence of complicating factors:

Complicating Factors

Development cost ratios

working documentation, working draft

Translation of text materials of technical documentation, inscriptions on drawings into a foreign language

Translation of materials from a foreign customer into Russian

Double checking of calculations, drawings and specifications, calculations of the volume of work, estimate documentation and other design materials, production of duplicate copies, increased requirements for the design and packaging of project documentation

Other factors influencing the increase in labor intensity of design work:

Current frequency and voltage, difference in permissible limits of fluctuations in current frequency, different from the Russian Federation (to the cost of designing electrical equipment, power supply, low currents, instrumentation and A, and, if necessary, other sections)

Dry or humid tropical climate

Development of design documentation taking into account the use by the design organization for the first time of equipment and materials purchased in the customer’s countries or supplied from third countries

Application of foreign norms and standards for materials and equipment, performing structural calculations based on them, etc., specified by the customer in the design assignment

Additional requirements for design documentation for the construction of facilities on contract terms, including the preparation of specifications for equipment and materials of temporary import

Note.

Increasing factors are applied to the cost of sections of project documentation or parts thereof, the development of which is more complicated.

Application

Extrapolation and interpolation when calculating the price of design work

In the case when the designed object has a value of the main indicator less than the minimum or more than the maximum indicator given in the table of the Collection of Prices or the Directory of Basic Prices, the basic price of the design is determined by extrapolation; in this case, the amount of adjustment to the price decreases by 40%, i.e. when calculating the indicator of the designed object X ass accepted with a coefficient of 0.6.

If the power indicator of an object is less than the table indicator, the base price of its design is determined by the formula:

C = a + b ×(0.4 × X t i p + 0.6 × X ass),

Where

a, b -constant values ​​taken from the table of the minimum value of the indicator;

X t i p -

X ass -

If the power indicator of an object is greater than the table indicator, the base price of its design is determined by the formula:

C = a + b ×(0.4 × X t ax + 0.6 × X rear),

Where

a, b -constant values ​​taken from the table of the maximum value of the indicator;

X tah -

X ass -indicator of the designed object.

In the case when the table shows only the value "A", and the designed object has an indicator value that does not coincide with those given in the table, the base price of its design is determined by interpolation or extrapolation; when extrapolating downward or upward, the value of the correction to the price is reduced by 40% (when calculating the value of the correction, a reduction factor K = 0.6 is introduced).

EXAMPLES OF DETERMINING THE BASE PRICE FOR DESIGNING FACILITIES,

whose indicators are higher, lower or are between the indicators given in the tables of the Directory *)

*) Table indicators are taken conditionally.

Constant values ​​of the base price for the development of project documentation, thousand roubles.

A

V

Sewage sludge incineration facilities with capacity, thousand m3/year: from 25 to 60

1 thousand m 3 /year

In the case when the table shows the values ​​" A " And " V ».

1. It is required to determine the base price for designing sewage sludge incineration facilities with a capacity of 15 thousand m 3 /year. The base price is determined by the formula:

WITH= a + b ×(0.4 × X t i p + 0.6 × X ass),

Where

A And V- constant values ​​taken according to the table of the minimum value of the indicator;

X min -the minimum indicator given in the table;

X ass -

66.5 + 1.2 × (0.4 × 25 + 0.6 × 15) = 89.3 thousand rubles.

2. It is required to determine the base price for designing sewage sludge incineration facilities with a capacity of 80 thousand m 3 /year. The base price is determined by the formula:

C = a + b ×(0.4 × X t ax + 0.6 × X rear),

Where

AAnd V- constant values ​​taken from the table of the maximum value of the indicator;

X tah -the maximum indicator given in the table;

X ass -a given indicator of the designed object.

66.5 + 1.2 × (0.4 × 60 +0.6 × 80) = 152.9 thousand rubles.

The Directory of basic prices for design work provides a table:

Name of the design object

Unit of measurement of the main indicator of the object

Constant values ​​of the base price for the development of project documentation, thousand rubles.

A

V

Wash water treatment facilities with capacity, m 3 /day.

In the case when the table shows only the value “ A ».

3. It is necessary to determine the base price for designing a wash water treatment facility with a capacity of 100 m 3 /day.

Calculation example:

44 - ´ (160 - 100) ´ 0.6 = 4.3 thousand rubles.

4. It is necessary to determine the base price for designing a wash water treatment facility with a capacity of 300 m 3 /day.

Calculation example:

44 + ´ (300 - 160) ´ 0.6 = 4.9 thousand rubles.

5. It is necessary to determine the base price for designing a wash water treatment facility with a capacity of 90,000 m 3 /day.

Calculation example:

369,1 + ´ (90000 - 80000) ´ 0.6 = 391.6 thousand rubles.

Before sending an electronic appeal to the Ministry of Construction of Russia, please read the rules of operation of this interactive service set out below.

1. Electronic applications within the sphere of competence of the Ministry of Construction of Russia, filled out in accordance with the attached form, are accepted for consideration.

2. An electronic appeal may contain a statement, complaint, proposal or request.

3. Electronic appeals sent through the official Internet portal of the Ministry of Construction of Russia are submitted for consideration to the department for working with citizens' appeals. The Ministry ensures objective, comprehensive and timely consideration of applications. Review of electronic appeals is free of charge.

4. In accordance with Federal Law No. 59-FZ of May 2, 2006 “On the procedure for considering appeals from citizens of the Russian Federation,” electronic appeals are registered within three days and sent, depending on the content, to the structural divisions of the Ministry. The appeal is considered within 30 days from the date of registration. An electronic appeal containing issues the solution of which is not within the competence of the Ministry of Construction of Russia is sent within seven days from the date of registration to the relevant body or the relevant official whose competence includes resolving the issues raised in the appeal, with notification of this to the citizen who sent the appeal.

5. Electronic appeal is not considered if:
- absence of the applicant’s surname and name;
- indication of an incomplete or unreliable postal address;
- the presence of obscene or offensive expressions in the text;
- the presence in the text of a threat to the life, health and property of an official, as well as members of his family;
- using a non-Cyrillic keyboard layout or only capital letters when typing;
- absence of punctuation marks in the text, presence of incomprehensible abbreviations;
- the presence in the text of a question to which the applicant has already been given a written answer on the merits in connection with previously sent appeals.

6. The response to the applicant is sent to the postal address specified when filling out the form.

7. When considering an appeal, disclosure of information contained in the appeal, as well as information relating to the private life of a citizen, is not permitted without his consent. Information about applicants’ personal data is stored and processed in compliance with the requirements of Russian legislation on personal data.

8. Appeals received through the site are summarized and presented to the leadership of the Ministry for information. Answers to the most frequently asked questions are periodically published in the sections “for residents” and “for specialists”



Related publications